Traffic Signal Infrastructure Modernization and Adaptive Signal Control Technology

City of Omaha’s traffic signal system is functionally obsolete for many of the traffic management needs of a large and growing metropolitan area. The project will upgrade various aspects of the City’s traffic signal system

Project Features

Improvements

  • Traffic Signal Controller Equipment 
  • Vehicle Detection 
  • Traffic Signal Management Software 
  • Traffic Signal Heads 
  • Communications System
  • Battery Back-up System 

Schedule

  • Complete:
    • Dodge St ASCT
    • 84th St ASCT
    • 132nd St ASCT
    • 144th St ASCT
    • Phase A1 Construction
    • Phase A2 Construction
    • Phase A3 Construction
    • Phase B1 Construction
    • Phase B2 Construction
    • Phase B3 Construction
    • Phase C1 Construction 
  • 2025:
    • Phase C2 Construction
    • Phase D1 Construction
  • 2026:
    • Phase D2 Construction
    • Phase E1 Construction 
  • 2027:
    • Phase E2 Construction
    • Phase F1 Construction
  • 2028:
    • Phase F2 Construction
    • Phase G1 Construction
  • 2029:
    • Phase H1 Construction 
 
Map that shows area of study will be West Center Road, 72nd Street, L Street, Q Street west, Dodge Street Midtown, 144th Street, Q Street, 90th Street, Blondo Street, Westroads, and other signals

Contact the Project Team

Project Contacts

Bryan Guy, PE, PTOE
Project Manager, Public Works Division
City of Omaha
402-444-5220